Startup Request Form "*" indicates required fields Step 1 of 5 20% Please provide details about the project prior to startup.Project InformationProject Name* Project Site Contact* Project Contact Email* Project Contact Phone*Project Address* Project City* Project State* Project Zip Code* Owner Information for Warranty RegistrationThis information is required to activate the equipment warranty. Owner Company Name* Owner Contact Name* Owner Address* Owner City* Owner State* Owner Zip Code* Owner Email* Owner Phone*Electrical ContractorElectrical Contractor Company Name* Electrical Contractor Contact Name* Electrical Contractor Email* Electrical Contractor Phone*Generator System InformationModel Number 1* Serial Number 1* Model Number 2 Serial Number 2 Model Number 3 Serial Number 3 Transfer Switch InformationModel Number 1* Serial Number 1* Model Number 2 Serial Number 2 Model Number 3 Serial Number 3 Model Number 4 Serial Number 4 Scheduling InformationPlease note we do request a minimum two (2) weeks' notice for scheduling. We will contact you to confirm availability and schedule. Please do not assume your date requested is scheduled until you have confirmation from the ESSE office. Is there a specific date you would like to request a startup? Date requested:* MM slash DD slash YYYY Will we be allowed to perform a simulated power failure to complete the system test at startup? Additional charges may apply for return trips. Yes No Is there a specific time window we can complete a simulated power failure test? Additional charges may apply for times outside M-F, 8am-5pm. Time window: Operational Training is usually conducted the same day as StartupWill the end user or representative be available the day of startup for training? Yes No If NO what Date and Time can training be scheduled for? Additional charges may apply.How close can a tech park to the generator?* Fuel System InformationPlease select a fuel system.* Gas Diesel Gas Fuel SystemIf you have selected Gas for your Fuel System. Select Gas type: Natural Gas LP Vapor LP Liquid Is the gaseous fuel system hooked up using a proper Flex Fuel Line and Regulator?* Yes No Correct NG or LP fuel pressure and volume? Refer to Generac Manual 10000046207 Fuel Supply piping for Industrial Generators. Yes No Inches of Water Column or Ounces of Pressure at Generator: BTU of Primary Regulator:* Pipe size:* Length of pipe between Primary Regulator and Generator:* Manual shut-off valve and all applicable safety valves are installed per local codes and standards. A manual shut-off valve and pressure test port (tee) should be installed near the generator:* Yes No Is this a Dedicated Fuel Line for the Generator(s)?* Yes No Number of 90 degree elbows installed:* Number of 45 degree elbows installed:* Number of Tee's installed:* Make of Regulator:* Model Number of Regulator:* *It is the Installers Responsibility to properly size the piping and regulators. Diesel Fuel SystemIf you have selected Diesel for your Fuel System. Is a Fuel Tank Pressure Test Required?* Yes No *If Yes Do Not Fuel unit. How many gallons of fuel in tank?* Electrical SystemUtility power is available with nominal voltage:* 240V 1-Phase 208V 3-Phase 240V 3-Phase 480V 3-Phase Generator set is grounded in compliance with local codes:* Yes No Generator and ATS data plate voltages match utility voltage:* Yes No Control wires are ran in separate conduit away from AC wiring:* Yes No AC wiring is properly sized, installed, and terminated:* Yes No *Note: ESSE will not terminate any AC wiringBuilding loads are connected properly in ATS:* Yes No Remote Emergency Stop Switch is installed:* Yes No N/A Remote Annunciator Panel (RAP) Installed:* Yes No N/A Wires ran and labeled from generator to annunciator panel:* Yes No N/A Generator is securely mounted and anchored to the concrete pad:* Yes No Exhaust System is installed if it shipped loose:* Yes No N/A Battery Charger circuit ran from the emergency distribution panel:* Yes No N/A Engine Block Heater circuit ran and terminated at the generator:* Yes No N/A GFCI Receptacle and/or Load Center, if used, is installed and connected:* Yes No N/A Starting Battery has been set in the unit: Yes No *Do Not Connect Batteries, Technician will connect at startup. All circuits must be run and terminated. No Power is to be supplied to the circuits at the generator until startup. Powering these circuits can cause damage to the unit not covered under warranty. Please Note: If the ESSE technician arrives on site for startup and determines that this checklist was not followed and the start-up cannot be performed, Additional Charges will apply for all necessary return trips or the time it takes to perform the corrections while the technician is on site. Additional charges will be at our normal rates. Overtime rates (1.5X normal rates) apply to hours beyond the standard workday M-F, 8am-5pm. Normal Rates $168 Hr-Labor, $168 Hr-Travel, and $3.25 per mile SignatureForm completed by: Company:* Email* Phone*Signature, type your name to sign:*Date signed:* MM slash DD slash YYYY Captcha Δ